Changing Places Facility

Steps towards access, inclusion and comfort

The Shire of Harvey is delivering a nationally accredited Changing Places facility for $574,000, with a contribution of $224,795 from Department of Communities.

These additions mark a significant step forward in ensuring that everyone in the community can enjoy the park’s amenities with comfort and dignity.

Changing Places toilets are larger than standard accessible toilets and provide people with support needs access to suitable and safe bathrooms. Feedback from the Access and Inclusion Advisory Group has led to further design features, such as a sliding door in lieu of a swing door on the UAT cubicle for increased ease of access for wheelchair users.

The new amenities will feature:

  • A fully equipped adult changing space designed to meet national standards and accessible via a MLAK (Master Locksmiths Access Key) system
  • A height-adjustable adult-sized change table, automatic door and privacy screen.
  • A Universal Access Toilet (UAT)
  • Male and female ambulant toilets, designed with additional space and handrails to support people with mobility challenges.

The Changing Places facility will be located at the entry to the pool, ensuring convenience for users.

Project Timeline

Completed
January–March 2025
Meriden Park Masterplan endorsed
Meriden Park Masterplan and Enclosed Dog Park endorsed by Council
Completed
September 2025
Consultation begins
Changing Places community consultation begins.
Completed
November 2025
Designs finalised
Changing Places design finalisation and tender process begins. November 2025
In progress
Early 2026
Construction begins
Construction and installation of Changing Places facility.
In progress
July 2026
Changing Places opening
Changing Places project completion and official opening to the community
Back top of the page