Please see below upcoming roadworks in the Harvey Region.
| Street | Roadworks description | Roadworks map |
|---|
| Street | Roadworks Description | Roadworks Map |
| Street | Roadworks Description | Roadworks Map |
|---|---|---|
| Cooper Street | Reconstruction works will commence on 16 March on Cooper Street cul-de-sac, including drainage works and laybacks on Galvin Street South.
From 31 March to 16 April, works will continue with kerbing and layback improvements, including an asphalt overlay from Hester Street to the end of the cul-de-sac on Cooper Street. Traffic control will be on site to assist motorists and pedestrians safely through the work area. |
View the plan |
| Hope Avenue | A section of Hope Avenue in Wokalup will be closed between Monday, 13 April to Friday, 17 April from 7am to 5pm.
This closure will facilitate culvert maintenance works on the existing bridge. Please follow detours in place and drive safe. |
View the plan |
| Third Street | Works will be undertaken at the entrance to Harvey Fresh between 12 April and 18 April 2026.
During this time, an asphalt overlay and concrete crossover will be installed. Traffic management will be in place. |
| Street | Roadworks Description | Roadworks Map |
|---|---|---|
| Railway Parade |
The Shire of Harvey will conduct road improvements on Railway Parade (between Clifton Road and School Road) from 21 April to 18 May 2026. Project Scope:
Resident Impact:
|