Brunswick River Pool Maintenance

Brunswick River Pool Maintenance
15 Oct 2021

Wet weather conditions have affected the timing of the planned maintenance works at the favourite Brunswick spot.

The Brunswick Pool dam wall requires some maintenance works to be carried out.

The prolonged wet weather conditions have affected the timing of the planned maintenance.

Once the water level recedes, these works will take place. 

Once the maintenance works to the rock wall has been completed, the walkway will be re-installed. 

Brunswick Pool is a picturesque section of the Brunswick River enjoyed by locals and visitors.